This Pro Forma Invoice has expired.

Pro Forma Invoice

From:

Msasani Tower
Kimweri Avenue
Dar es Salaam
P.O. BOX 4010

Pro Forma Invoice Number PRO-0047
Pro Forma Invoice Date July 5, 2019
Valid Until July 20, 2019
Total TZS 46,000,000.00
To:
Yapı Merkezi İnşaat ve Sanayi A.Ş.

M: +255 677 046 399
Dar Es Salaam-Morogoro Railway Line
Tanzania

Qty Item PriceAdjustSub Total
15 Daikin Air Conditioner 12,000 BTU Wall Mount Split Unit R22 Gas

Included:
- 2 year warranty + Defects Liability contract for 18 months
- Supply, Install, test, and commission
- Haike installation kit - copper pipe and armaflex 3 meters long, wiring, bracket
- Automatic Voltage Switcher (AVS)

Trunking and additional copper pipping will require site visit or specifications*

TZS 1,200,000.000.00%TZS 18,000,000.00
13 Daikin Air Conditioner 18,000 BTU Wall Mount Split Unit R22 Gas

Included:
- 2 year warranty + Defects Liability contract for 18 months
- Supply, Install, test, and commission
- Haike installation kit - copper pipe and armaflex 3 meters long, wiring, bracket
- Automatic Voltage Switcher (AVS)

Trunking and additional copper pipping will require site visit or specifications*

TZS 1,500,000.000.00%TZS 19,500,000.00
5 Daikin Air Conditioner 24,000 BTU Wall Mount Split Unit R22 Gas

Included:
- 2 year warranty + Defects Liability contract for 18 months
- Supply, Install, test, and commission
- Haike installation kit - copper pipe and armaflex 3 meters long, wiring, bracket
- Automatic Voltage Switcher (AVS)

Trunking and additional copper pipping will require site visit or specifications*

TZS 1,700,000.000.00%TZS 8,500,000.00
Sub Total TZS 46,000,000.00
VAT TZS 7,016,949.15
Total TZS 46,000,000.00

Add a comment

Your email address will not be published. Required fields are marked *